For this historical church, built in three phases from 1892 to 1921, an initial study of the mechanical and electrical systems was completed to determine renovation needs. The areas studied include: heating, air conditioning, ventilation, plumbing, fire protection, power distribution and lighting systems. In 1996, DAE completed mechanical and electrical design for installation of a boiler for this church.